Building Progress
October 2008
One year from idea to completion:
Building is completed in time for rainy season!
click image to enlarge
PAC has even had its first surgery day post-fire in October, neutering temple animals
|
|
|
completed clinic |
cat yard opposite clinic |
back of cat yard |
|
|
|
patients pre & post surgery |
set up for surgery |
working yard |
|
|
|
pathway to clinic - with Suay |
store room cleared out and organized |
|
The fire damaged roof was repaired, but windows, ceiling and electrics left for now
|
|
new roof |
new roof from outside |
Yard, wall & driveway completed
|
|
|
|
new gate in place |
ground still needs to settle – the rains should help! |
entrance yard |
wall looks less depressing when painted! |
and it is all thanks to
|
|
|
|
Alec
PAC’s project manager |
Pi Torn
our excellent building foreman |
Alec’s wife, Amanda
responsible for all financial reports |
And Torn’s mum
for her unending support |
September 2008
The clinic is successfully finished except for small fiddly jobs
click image to enlarge
|
|
|
western toilet! |
lab/pharmacy |
isolation kennels with stainless steel doors |
|
|
|
isolation sink & cupboard |
critical care kennels, sink & cupboard |
clinic/kennel yard with sink |
PAC’s land was secured around the perimeter with a wall & fence with barbed wire:
not how we had expected to have to live!
|
|
|
security wall on east |
security wall on south, facing road |
security wall on west |
The driveway for access to the road was cleared & walled
|
|
|
from road looking to clinic |
water tower to hold our second-hand tank was erected to ensure water during times of power-cuts |
Nurse Shanna Oxenbridge (whose contract we cancelled due to the fire) visited us with her Dad, and they donated a Spirit House to help protect PAC.

August 2008
Arson Attack
click image to enlarge
All previous renovations (see May 2008) lost, as well as entire library, medications, vaccines, computer, fridge, etc
|
|
|
roof burned through |
burned roof & soot |
lost library & electrics |
|
|
|
lost computer & meds – thankfully oxygen did not explode |
fire stopped before reaching wood house |
|
Though materials had been bought and foundations dug for Staff Housing, this plan was abandoned so that resources could be used to build a security wall instead
|
|
|
staff hoursing materials |
house plot facing north |
house plot facing south |
As the clinic was close to completion, and the final materials already ordered, it was decided to finish the project
|
|
|
front of clinic |
consultation room |
critical care |
|
|
|
surgery room |
lab/pharmacy |
isolation kennels |
|
|
|
isolation sink |
isolation yard – filled with cabinets |
clinic toilet |
July 2008
A Clinic Emerges!
click image to enlarge
|
|
|
Clinic Foundation |
Clinic frame |
Clinic Internal Walls |
|
|
|
Clinic External Walls and Roof |
Clinic with roof |
Clinic |
|
|
|
Clinic Painted |
Lab to Isolation |
Critical Care Kennels |
|
|
|
Consutation Room |
|
Surgery Room with Alec |
June 2008
Kennel are complete, work on the dog yard continues
click image to enlarge
|
|
|
Cat kennels with Yard |
Cat kennels |
Complete Kennels |
|
|
|
Dog Yard |
Complete Dog Kennels |
|
May 2008
Renovation completed & storeroom built
click image to enlarge
|
|
|
|
Front view |
Back view |
Back view of houses |
Store room |
|
|
|
Wood house |
Office area in brick house |
Inside brick house |
|
|
|
|
Kitchen |
Kitchen |
Office in wood house |
Bedroom in wood house |
Kennel development
Entire clinic relocates to Woktum- thanks to the patient help of many volunteers, especially Yoga Retreat; Work starts on kennels – slight complications due to slope of land and therefore need for stilts, but great potential with 2 large kennels, 7 small kennels, 9 cat kennels and a cat exercise yard
click image to enlarge
|
|
|
Building kennels |
|
|
|
Cat kennels |
Large dog kennels |
Small dog kennels |
|
|
|
Feeding area |
More kennels |
April 2008
Architect, project managers & builders hired, designs finalised, buildings staked out, renovation work started
click image to enlarge
|
|
|
|
Front veiw |
Back view |
Wood house |
|
|
|
Steve Haigh volunteered to help design new premises |
Kitchen |
Inside wood house |
Inside brick house |
March 2008
PAC buys land in the name of PAC’s president, Kuhn Nira
1.25 rai in Woktum, south west Koh PhaNgan, with houses, well and electricity already in place …
click image to enlarge
|
|
|
Front view of houses |
Wooden house |
Wooden house |
|
|
|
View of houses |
Inside house |
View from land |
|
|
|
View facing north |
View facing south |
View facing west |
|